2 GW+ Hyperscale Computing Platform
European platform with high-voltage grid connections, extensive land, renewable-backed power, and flexible deployment options from 10-20 MW to 2 GW+ capacity for hyperscale AI and HPC operators.
For hyperscale AI buyers, infrastructure funds, compute partners, and strategic development partners.
Customizable Modular Platform
- → Scalable from 10-20 MW to 2 GW+ capacity based on your deployment needs
- → Platform as a "menu" of concrete sites that combine into a unified infrastructure ecosystem
- → Europe-first infrastructure with additional global locations available
- → High-voltage grid connections with direct access to major transmission networks
- → Renewable-backed power with integrated energy storage and solar capacity
Start small with 10-20 MW or scale to full capacity. Each site is concrete infrastructure designed to work together as a modular platform, customizable to your specific data center requirements and growth trajectory.
Primary European Sites
Four proven European locations offering high-voltage grid connections, substantial land availability, renewable energy integration, and strategic positioning. Additional global sites available upon request.
Site 1
Land Availability
80+ hectares
Power Potential
500+ MW
Positioning
Regional Hub
Grid Connection
HV
Strategic regional location with excellent grid access and renewable integration potential.
Site 2
Land Availability
90+ hectares
Power Potential
550+ MW
Positioning
Central Location
Grid Connection
HV
Central location with strong grid infrastructure and integrated renewable energy sources.
Site 3
Land Availability
75+ hectares
Power Potential
450+ MW
Positioning
Urban Proximity
Grid Connection
HV
Premium location with proximity to major infrastructure and development partnerships.
Site 4
Land Availability
85+ hectares
Power Potential
500+ MW
Positioning
Strategic Access
Grid Connection
HV
Strategic location with direct access to major infrastructure and connectivity.
Renewable-Backed Power at Scale
Integrated energy storage, solar, and wind capacity providing bankable, long-term power solutions for hyperscale operations.
Enabling peak shaving, grid stability, and consistent power delivery
Integrated across strategic sites with modern efficiency standards
Leveraging regional wind resources for consistent generation
Long-Term Bankable Power Purchase Agreement
Power Purchase Agreement
- ✓ 10-year fixed pricing structure
- ✓ Predictable long-term power costs
- ✓ Bankable and financeable terms
- ✓ Renewable energy certification included
Operational Benefits
- ✓ Grid stability through BESS integration
- ✓ Redundancy across multiple sites
- ✓ Phased capacity scaling (100 MW to 2 GW+)
- ✓ ESG compliance for global operators
Our renewable-backed power structure is designed to meet the strict operational and financial requirements of hyperscale AI and HPC operators, providing the foundation for sustainable, cost-effective infrastructure deployment.
Flexible Partnership Models
Tailored approaches to partnership structured around your investment, operational, and strategic objectives.
Strategic Capital
Equity partnership with direct investment in platform development and operating returns.
- • Direct equity stake
- • Board representation
- • Revenue sharing
Land & Power Lease
Long-term lease arrangements for land and power with fixed-rate agreements.
- • Long-term lease terms
- • Fixed power pricing
- • Flexible capacity options
Joint Venture
Co-owned and co-operated platform with shared governance and decision-making.
- • Shared ownership
- • Joint operations
- • Strategic alignment
Co-Development
Phased development partnership with staged investment and scaling options.
- • Phased deployment
- • Risk sharing
- • Option to expand
Flexible Deployment Options
Start with 10-20 MW or deploy at full capacity. The platform is modular—choose the sites and capacity that match your deployment timeline and growth needs. Select deployment-ready sites for immediate capacity, or parallel-build sites to optimize timeline and cost through concurrent infrastructure development.
Minimal Deployment
Quick time-to-market option
- ✓ Single deployment-ready site
- ✓ Fastest time to power
- ✓ Path to scale upward
- ✓ Ideal for proof-of-concept
Multi-Site Cluster
Balanced capacity & timeline optimization
- ✓ Mix of ready and parallel-build sites
- ✓ Geographic diversity and resilience
- ✓ Concurrent infrastructure development
- ✓ Cost-optimized deployment strategy
Full Platform
Maximum scale and flexibility
- ✓ All four European sites combined
- ✓ Phased rollout with parallel builds
- ✓ Continental redundancy and reach
- ✓ Global expansion options available
Deployment-Ready Sites
Existing grid and power infrastructure allows immediate data center deployment with minimal lead time. Fastest path to operational capacity.
Parallel Build Sites
Power stations and transformers are constructed alongside data center deployment. Optimizes project timeline and reduces upfront infrastructure costs.
Each configuration combines proven European infrastructure with flexible renewable power agreements tailored to your timeline and capacity requirements. Discuss your specific deployment strategy with our team.
Confidential Discussions
For confidential discussions about the hyperscale platform, please contact our infrastructure team.
Contact Our Team
Infrastructure Development Team
For detailed discussions, site assessments, and partnership inquiries